• ECM Projects

    • Ultra Low Temp Freezer PM Program (240 Units) – 2015-2017
    • WAB HCCM Controls System upgrade – 2016
    • WAB-AHU/EAHU Fan Arrays – 2016
    • NRB Supply Air Temp Reset – 2016
    • Campus wide HVAC coil cleaning – 2016
    • FCU upgrade to DDC, featuring ECM motors – 2013-2016
    • Steam trap Discharge Sensors – 2015-2016
    • Grundfross water Booster System – NRB – 2015
    • Converted Pneumatic Control system to Direct Digital Control System (DDC) in Tosteson Medical Education Center – 2013 -2014
  • Plans, Procedures and Standards

    • Strategic Energy 5 year Plan – 2016
    • HMS Facilities Construction Design Standards includes Energy and Commissioning – 2016
    • BAS Master Plan – 2015
  • Perform Ashrae Level II Energy Audits

    • Armenise – 2017
    • C Building – 2016
    • WAB – 2015
    • Campus wide Lighting audit – 2015
    • Mudd, LHRRB – 2014
    • NRB, HIM – 2013
  • Water Conservation

    • Low flow faucet aerators and shower heads – 2017
    • Campus wide Water Audit performed – 2016
    • Irrigation System Controls upgrade – 2015
  • Energy Dashboards and Information Systems

    • Eversource Memorandum of Understanding – 2015-2018
    • Internal Energy Dashboard – Coresight
    • Internal Dashboard – Heat MAP
    • PI notifications
    • Online utility dashboards
    • Implement “Energy Cap” – Energy Accounting Software
  • BAS - Quality Improvement Initiatives

    • BMS Master spreadsheet – 2016
    • Steam trap discharge sensors 2015 – 2016
    • BAS Alarm Management Audit – 2015
    • BAS Fault Detection Program – 2015 (over 700 items identified)
    • CHW Load Shed Recommission – 2015
    • Hot-Cold Protocol Operator Training – 2015
    • Quality Control Program - BAS System – 2014-2016
    • Recommission Custom code in to ensure Harvard temperature standards are in compliance – 2014
    • Continuous CX BAS - HIM , NRB, WAB – 2013-2014
  • ACH Reduction

    • HCCM Holding Rooms Spaces
    • NRB/REB Rebalance of non-lab spaces to current ASHRAE/ IECC ventilation standards
    • TMEC exhaust fan rebalance and consolidation
  • Occupancy Sensors for HVAC Setback and Lighting Control

    Mudd, LHRRB, C, 180 HSDM, REB, WAB

  • Lighting

    • Replaced exterior HID Floodlight and wall pack fixtures to LED fixtures
    • WAB Garage LED lighting upgrade
    • Vanderbilt Hall LED exterior lighting project
    • HCCM 4’ LED tube upgrade – NRB
    • WAB HCCM LED lighting upgrade
    • CFL to LED Lunera 4 pin lighting upgrade – 2,000+ Lamps
  • Recommissioning and Optimization Projects

    • NRB HCCM – 2017
    • Mudd HCCM – 2017
    • WAB HCCM – 2016
    • Modell Center for Immunology – 2015
    • HIM Johnson BAS System – 2015
    • TMEC – 2014
    • NRB Phoenix Systems – 2014
    • REB & Main Dental – 2014
    • 180 Longwood 2013