ECM Projects
- Ultra Low Temp Freezer PM Program (240 Units) – 2015-2017
- WAB HCCM Controls System upgrade – 2016
- WAB-AHU/EAHU Fan Arrays – 2016
- NRB Supply Air Temp Reset – 2016
- Campus wide HVAC coil cleaning – 2016
- FCU upgrade to DDC, featuring ECM motors – 2013-2016
- Steam trap Discharge Sensors – 2015-2016
- Grundfross water Booster System – NRB – 2015
- Converted Pneumatic Control system to Direct Digital Control System (DDC) in Tosteson Medical Education Center – 2013 -2014
-
Plans, Procedures and Standards
- Strategic Energy 5 year Plan – 2016
- HMS Facilities Construction Design Standards includes Energy and Commissioning – 2016
- BAS Master Plan – 2015
-
Perform Ashrae Level II Energy Audits
- Armenise – 2017
- C Building – 2016
- WAB – 2015
- Campus wide Lighting audit – 2015
- Mudd, LHRRB – 2014
- NRB, HIM – 2013
-
Water Conservation
- Low flow faucet aerators and shower heads – 2017
- Campus wide Water Audit performed – 2016
- Irrigation System Controls upgrade – 2015
-
Energy Dashboards and Information Systems
- Eversource Memorandum of Understanding – 2015-2018
- Internal Energy Dashboard – Coresight
- Internal Dashboard – Heat MAP
- PI notifications
- Online utility dashboards
- Implement “Energy Cap” – Energy Accounting Software
-
BAS - Quality Improvement Initiatives
- BMS Master spreadsheet – 2016
- Steam trap discharge sensors 2015 – 2016
- BAS Alarm Management Audit – 2015
- BAS Fault Detection Program – 2015 (over 700 items identified)
- CHW Load Shed Recommission – 2015
- Hot-Cold Protocol Operator Training – 2015
- Quality Control Program - BAS System – 2014-2016
- Recommission Custom code in to ensure Harvard temperature standards are in compliance – 2014
- Continuous CX BAS - HIM , NRB, WAB – 2013-2014
-
ACH Reduction
- HCCM Holding Rooms Spaces
- NRB/REB Rebalance of non-lab spaces to current ASHRAE/ IECC ventilation standards
- TMEC exhaust fan rebalance and consolidation
-
Occupancy Sensors for HVAC Setback and Lighting Control
Mudd, LHRRB, C, 180 HSDM, REB, WAB
-
Lighting
- Replaced exterior HID Floodlight and wall pack fixtures to LED fixtures
- WAB Garage LED lighting upgrade
- Vanderbilt Hall LED exterior lighting project
- HCCM 4’ LED tube upgrade – NRB
- WAB HCCM LED lighting upgrade
- CFL to LED Lunera 4 pin lighting upgrade – 2,000+ Lamps
-
Recommissioning and Optimization Projects
- NRB HCCM – 2017
- Mudd HCCM – 2017
- WAB HCCM – 2016
- Modell Center for Immunology – 2015
- HIM Johnson BAS System – 2015
- TMEC – 2014
- NRB Phoenix Systems – 2014
- REB & Main Dental – 2014
- 180 Longwood 2013