• Plans, Procedures and Standards

    • GreenerU Investment Grade Audits – 2021-Present
    • Long Range Plan: Decentralizing Compressed Air on Campus – 2021-Present
    • Strategic Energy 5-year Plan – 2016, 2019, 2021
    • HMS Facilities Construction Design Standards includes Energy and Commissioning – 2016, 2022
    • BAS Master Plan – 2015, 2021 
  • Energy Audits

    • GreenerU Main Dental & REB Audits– 2023-2024
    • ASHRAE Level II Energy Audits – Completed for all buildings (2015-2019)
    • Campus Compressed Air Systems – 2021-Present
    • Campus Insulation – 2021-Present
    • Campus-wide lighting audit – 2015-2022
    • Greener U Investment Grade Audits #2, #3, #4 – 2022-2023
    • Greener U Investment Grade Audits #5 – 2023-2024
    • Kitchen Appliances & Water Audit – 2023 
  • Water Conservation

    • NRB Getinge Water Saver Kits for 22 Autoclaves – 2022
    • NRB Quench Valve Replacements – 2020
    • Low flow faucet aerators and shower heads – 2017
    • Campus wide Water Audit performed – 2016
    • Irrigation System Controls upgrade – 2015, 2021
  • Energy Dashboards and Information Systems

    • Clockworks Analytics Fault Detection Software
    • Internal Energy Dashboard – Retina
    • Public Energy Dashboard from Altolus 
    • Data Historian and Visualization Platform OSI PiVision
  • BAS Improvement Initiatives

    • BAS Desigo Upgrades – 2022-Present
    • NRB BAS Transition to BACnet – 2022 
    • BMS Master spreadsheet – 2016
    • Steam trap discharge sensors 2015 – 2016
    • Transition from pneumatic actuation to DDC – 2016-2022 
  • ACH Reduction

    • HCCM Holding Rooms Spaces
    • NRB/REB Rebalance of non-lab spaces to current ASHRAE/ IECC ventilation standards
    • TMEC exhaust fan rebalance and consolidation 
  • Occupancy Sensors for HVAC Setback and Lighting Control

    • Mudd, LHRRB, C, 180 HSDM, REB, WAB
  • LED Lighting Upgrade Projects

    • GreenerU South Campus & NRB Campus Lighting Upgrades – 2022-Present
    • GreenerU Main Dental & REB Lighting Upgrades – 2024
    • Replaced exterior HID Floodlight and wall pack fixtures to LED fixtures
    • WAB Garage LED lighting upgrade
    • Vanderbilt Hall LED exterior lighting project
    • HCCM 4’ LED tube upgrade – NRB
    • WAB HCCM LED lighting upgrade
    • CFL to LED Lunera 4 pin lighting upgrade – 2,000+ Lamps
  • RCx and HVAC Energy Projects

    • GreenerU NRB & WAB Heat Recovery Improvements – 2023-2024
    • GreenerU NRB Heat Recovery Chiller Project – 2023-2024
    • Mudd AHU-1 Chilled Water Valve Replacement – 2024 
    • TMEC AC-2 Chilled Water Valve Replacement – 2024 
    • TMEC AC-1 – 2021 to 2022
    • NRB CoolTrol Installations Round 2 – 2021
    • NRB Air Handling Units 5 & 6 Chilled Water Valve Replacements – 2021
    • NRB Air Handling Units 7 & 12 Chilled Water Valve Replacements – 2022
    • NRB Heating Ventilation Units 1, 2, 3 & 5 Steam Valve Replacements – 2021
    • WAB Sterilizer Software Upgrade – 2022
    • NRB HCCM – 2017
    • Mudd HCCM – 2017
    • WAB HCCM – 2016
  • Other

    • Steam Trap Insulation Jackets (campus wide) – 2024 
    • Steam Trap Replacements (campus wide) – 2023-present
    • Campus air handling units’ temperature sensor additions – 2023-present
    • Campus wide steam insulation repairs & improvements – 2023-present
    • NRB Solar PV System - 2021
    • Ultra-Low Temp Freezer PM Program (240 Units) – 2015-2022
    • Campus wide HVAC coil cleaning – 2016, 2021, 2023
    • Campus doors weatherization – 2023