Plans, Procedures and Standards

  • GreenerU Investment Grade Audits – 2021-Present
  • Long Range Plan: Decentralizing Compressed Air on Campus – 2021-Present
  • Strategic Energy 5-year Plan – 2016, 2019, 2021
  • HMS Facilities Construction Design Standards includes Energy and Commissioning – 2016, 2022
  • BAS Master Plan – 2015, 2021 

Energy Audits

  • GreenerU Main Dental & REB Audits– 2023-2024
  • ASHRAE Level II Energy Audits – Completed for all buildings (2015-2019)
  • Campus Compressed Air Systems – 2021-Present
  • Campus Insulation – 2021-Present
  • Campus-wide lighting audit – 2015-2022
  • Greener U Investment Grade Audits #2, #3, #4 – 2022-2023
  • Greener U Investment Grade Audits #5 – 2023-2024
  • Kitchen Appliances & Water Audit – 2023 

Water Conservation

  • NRB Getinge Water Saver Kits for 22 Autoclaves – 2022
  • NRB Quench Valve Replacements – 2020
  • Low flow faucet aerators and shower heads – 2017
  • Campus wide Water Audit performed – 2016
  • Irrigation System Controls upgrade – 2015, 2021

Energy Dashboards and Information Systems

  • Clockworks Analytics Fault Detection Software
  • Internal Energy Dashboard – Retina
  • Public Energy Dashboard from Altolus 
  • Data Historian and Visualization Platform OSI PiVision

BAS Improvement Initiatives

  • BAS Desigo Upgrades – 2022-Present
  • NRB BAS Transition to BACnet – 2022 
  • BMS Master spreadsheet – 2016
  • Steam trap discharge sensors 2015 – 2016
  • Transition from pneumatic actuation to DDC – 2016-2022 

ACH Reduction

  • HCCM Holding Rooms Spaces
  • NRB/REB Rebalance of non-lab spaces to current ASHRAE/ IECC ventilation standards
  • TMEC exhaust fan rebalance and consolidation 

LED Lighting Upgrade Projects

  • GreenerU South Campus & NRB Campus Lighting Upgrades – 2022-Present
  • GreenerU Main Dental & REB Lighting Upgrades – 2024
  • Replaced exterior HID Floodlight and wall pack fixtures to LED fixtures
  • WAB Garage LED lighting upgrade
  • Vanderbilt Hall LED exterior lighting project
  • HCCM 4’ LED tube upgrade – NRB
  • WAB HCCM LED lighting upgrade
  • CFL to LED Lunera 4 pin lighting upgrade – 2,000+ Lamps

RCx and HVAC Energy Projects

  • GreenerU NRB & WAB Heat Recovery Improvements – 2023-2024
  • GreenerU NRB Heat Recovery Chiller Project – 2023-2024
  • Mudd AHU-1 Chilled Water Valve Replacement – 2024 
  • TMEC AC-2 Chilled Water Valve Replacement – 2024 
  • TMEC AC-1 – 2021 to 2022
  • NRB CoolTrol Installations Round 2 – 2021
  • NRB Air Handling Units 5 & 6 Chilled Water Valve Replacements – 2021
  • NRB Air Handling Units 7 & 12 Chilled Water Valve Replacements – 2022
  • NRB Heating Ventilation Units 1, 2, 3 & 5 Steam Valve Replacements – 2021
  • WAB Sterilizer Software Upgrade – 2022
  • NRB HCCM – 2017
  • Mudd HCCM – 2017
  • WAB HCCM – 2016

Other

  • Steam Trap Insulation Jackets (campus wide) – 2024 
  • Steam Trap Replacements (campus wide) – 2023-present
  • Campus air handling units’ temperature sensor additions – 2023-present
  • Campus wide steam insulation repairs & improvements – 2023-present
  • NRB Solar PV System - 2021
  • Ultra-Low Temp Freezer PM Program (240 Units) – 2015-2022
  • Campus wide HVAC coil cleaning – 2016, 2021, 2023
  • Campus doors weatherization – 2023